Menu

Road/sidewalk closure: Linden Dr. construction near Babcock Hall

There will be a road/sidewalk project starting on July 17th that affects Linden Drive near Babcock Hall. The work will consist of milling Linden Drive from the intersection of Babcock Drive up to the Horse Barn. The road will be closed for most of the duration of the project. Access to Lot 40 will be kept open, but parking on the north side of Babcock Hall will be closed. The concrete sidewalk and curbs will be removed and replaced. The north sidewalk will remain accessible during construction, but the south sidewalk will have some blockage and a narrower path. Those who need an accessible route need to use the north sidewalk. Access to Babcock Hall will remain open.

There will be signs to direct people to get around the area. The project duration is 21 days (completed around first part of August), weather permitting.

This entry was posted in Human Resources, Workplace by vanzoeren@wisc.edu. Bookmark the permalink.